Issa Rae, Terrence J, And More Attend The TIME Impact Dinner
Red Carpet Rundown: Issa Rae, Terrence J, And More Attend The TIME Impact Dinner - Page 7
Share the post
Share this link via
Or copy link

Source: Craig Barritt / Getty
Issa Rae gives a touching speech at the TIME Impact Dinner
Related Stories

Source: Craig Barritt / Getty
1. Issa Rae

Issa Rae donned a classic all-black dress that she paired with a beautiful diamond necklace.
2. Issa Rae

The dress featured a deep-V back, accentuated with silver hardware on the curve of her back.
3. Gail Bean

Gail Bean graced the carpet in a brown mini dress that highlighted her toned arms.
4. Terrence J

Terrence J looked dapper in an all-black suit.
5. Angela Yee

Angela Yee wore a black and white ruffled blouse, partnered with a black skirt and black knee-high boots.
6. Tierra Whack

Tierra Whack wore a floral tunic that matched her red glasses and high ponytail perfectly.
7. Aurora James

Aurora James looked radiant in a red floor-length, long-sleeve, mock-neck dress.
Red Carpet Rundown: Issa Rae, Terrence J, And More Attend The TIME Impact Dinner - Page 7 was originally published on hellobeautiful.com